Maximum Demand Case Study – Shopping Mall, Cheras

Maximum Demand Savings for Mall in Cheras

This is a prominent mall in Cheras with over 220 established retail outlets, two exhibition halls  featuring the latest events, and a large capacity parking.

We installed our demand profiling system and provided services to liaise with TNB to optimize the energy bills, TNB commercial tariffs and TNB Maximum Demand (MD) charges for this building.

This resulted in a savings of up to RM 20,000 per month! Even 2 years on, the maximum demand recorded and its corresponding energy cost savings are still there to be seen.

The return of investment for this project is well under twelve months.

Learn more from us today!

*Product Images and associated images are for illustrative and reference purposes only and may differ from the actual product.Due to differences in monitors, colours of products may also appear different to those shown on the site. Products may vary due to product enchancement.

© 2019 - 2024 by iBright Great Resources Sdn Bhd