Maximum Demand Case Studies

Case Study 1

Aluminium Extrusion Factory – RM9250 reduction in TNB bill

See how we managed to reduce the TNB bill for a factory in Malaysia by analyzing its maximum demand.

Case Study 2

Lifestyle Mall – RM39k reduction in TNB bill

By monitoring their Maximum Demand and implementing maximum demand controls, we were able to help them lower their energy cost.

Case Study 3

Commercial Building, Kuala Lumpur City Centre Area

By using efficient energy management, we were able to reduce energy costs and TNB Maximum Demand (MD) costs.

Case Study 4

Factory in Sungai Buloh

We were able to save this factory RM9,250 a month on their TNB Maximum Demand charges.

Case Study 5

Savings for Mall in Cheras

This is a case study in maximum demand control for a mall in Cheras resulting in large savings.

Case Study 6

Factory in Shah Alam

We were able to get significant savings with no impact on production output. The figure about outlines the discount received from TNB.

Case Study 7

Multi-Level Parking Lot, Damansara City

This project return on investment was well under 18 months. TNB Bills was brought from RM100,000 to under RM60,000.