Maximum Demand (MD) Case Study 3 – Commercial Building, Kuala Lumpur City Centre Area

Building in Jalan P. Ramlee

This is a 36-level office building complete with 450 car parking bays in 7 stories of car park. It’s located in the prime area: The Golden Triangle of Kuala Lumpur City Centre. Over the years, we have managed to reduce the energy costs and TNB Maximum Demand (MD) costs through efficient energy management. During the same period, the occupancy rate of the building has also increased.

In short – yes, it is possible to be more efficient even for an office building.

To learn more please contact us today through our contact form or our contact information at the bottom of the site.

*Product Images and associated images are for illustrative and reference purposes only and may differ from the actual product.Due to differences in monitors, colours of products may also appear different to those shown on the site. Products may vary due to product enchancement.

© 2019 - 2024 by iBright Great Resources Sdn Bhd