Maximum Demand Case Studies

Case Study 1 – Aluminium Extrusion Factory

RM9250 reduction in TNB bill. See how we managed to reduce the TNB bill for a factory in Malaysia by analyzing its maximum demand.

Read more →

Maximum Demand Control Case Study 2 – Lifestyle Mall

RM39k reduction in TNB bill. By monitoring their Maximum Demand and implementing maximum demand controls, we were able to help them lower their energy cost.

Read more →

Maximum Demand (MD) Case Study 3 – Commercial Building, Kuala Lumpur City Centre Area

By using efficient energy management, we were able to reduce energy costs and TNB Maximum Demand (MD) costs.

Read more →

Maximum Demand Control in Factory, Sungai Buloh

We were able to save this factory RM9,250 a month on their TNB Maximum Demand charges.

Read more →

Maximum Demand Case Study – Shopping Mall, Cheras

This is a case study in maximum demand control for a mall in Cheras resulting in large savings.

Read more →

Shah Alam Factory – A TNB Savings Case

We were able to get significant savings with no impact on production output.

Read more →

Maximum Demand Case Study – Multi-Level Parking Lot, Damansara City

This project return on investment was well under 18 months. TNB Bills was brought from RM100,000 to under RM60,000.

Read more →

*Product Images and associated images are for illustrative and reference purposes only and may differ from the actual product.Due to differences in monitors, colours of products may also appear different to those shown on the site. Products may vary due to product enchancement.

© 2019 - 2026 by iBright Great Resources Sdn Bhd