See how we managed to reduce the TNB bill for a factory in Malaysia by analyzing its maximum demand.
By monitoring their Maximum Demand and implementing maximum demand controls, we were able to help them lower their energy cost.
By using efficient energy management, we were able to reduce energy costs and TNB Maximum Demand (MD) costs.
We were able to save this factory RM9,250 a month on their TNB Maximum Demand charges.
This is a case study in maximum demand control for a mall in Cheras resulting in large savings.
We were able to get significant savings with no impact on production output. The figure about outlines the discount received from TNB.
This project return on investment was well under 18 months. TNB Bills was brought from RM100,000 to under RM60,000.
*Product Images and associated images are for illustrative and reference purposes only and may differ from the actual product.Due to differences in monitors, colours of products may also appear different to those shown on the site. Products may vary due to product enchancement.